Sholinganallur: OMR's Premium Address
Sholinganallur sits at the most commercially active stretch of Old Mahabalipuram Road, approximately 16 km from Chennai's CBD. It is home to Citi Group's India campus, Cognizant's 7-lakh sqft facility, and over 40 other IT/ITeS offices — making it the epicentre of OMR's employment demand.
Unlike the southern stretches of OMR, Sholinganallur benefits from excellent connectivity to the city and a more mature social infrastructure ecosystem, commanding a consistent price premium over comparable OMR localities.
Price Bands in Sholinganallur (2026)
- Rajiv Gandhi Salai (OMR main road): ₹9,800–₹11,000 per sqft for new apartments
- Sholinganallur Junction area: ₹9,000–₹10,500 per sqft
- Back roads (Nehru Nagar, Karapakkam Link Road): ₹8,500–₹9,500 per sqft
- 2BHK (1,100 sqft): ₹95 lakh–₹1.1 crore for new projects
- 3BHK (1,500 sqft): ₹1.3–₹1.65 crore for new projects
Metro Impact: The 2027 Catalyst
Chennai Metro Phase 2 Line 3 is being extended to Sholinganallur, with a dedicated station expected to be operational by late 2027. Based on similar metro station announcements in Velachery and Guindy, a 15–20% pre-station price appreciation is expected in the 1.5 km radius around the proposed station.
Buyers acquiring property in Sholinganallur in 2026 are effectively buying ahead of this catalyst at a pre-announcement price.
Rental Market
Sholinganallur's rental market is among the tightest on OMR:
- Furnished 2BHK: ₹23,000–₹30,000/month
- Unfurnished 2BHK: ₹18,000–₹24,000/month
- Furnished 3BHK: ₹32,000–₹42,000/month
Rental vacancy is below 2%, and most apartments let within 2–3 weeks of listing. Gross rental yields average 3.5–4.0%.
Top Projects and TNRERA Status
As of Q1 2026, 19 residential projects are actively registered under TNRERA in the Sholinganallur locality. Major developers with completed or ongoing projects include Casagrand, PBEL City, and Mahindra Lifespaces. Always verify RERA status at tnrera.in before paying any advance.
Practical Buyer Tips
- Prefer projects on the western (city-facing) side of OMR for faster CBD connectivity
- Check for CMDA or DTCP approved layouts — some peripheral plots have been developed without proper approval
- Verify that the project has obtained a fire NOC, especially for towers above G+4
- Waterlogging can occur in the rainy season; inspect during or just after the northeast monsoon (October–November)